Download Primavera P6 Professional 17.7 for Windows
Free download Primavera P6 Professional 17.7 full version standalone offline installer for Windows PC,
Primavera P6 Professional Overview
Oracle Primavera is one of the best, strongest, most trusted applications in project management, design and implementation. This application is a perfect solution for managing projects and designs in any size and size with any degree of difficulty. Primavera P6 is also used for timing as well as control of various projects. In the construction, industrial and software projects where various activities are carried out on a regular basis, this software can also be used to schedule and control the project and estimate the cost of those projects. Primavera P6 has a simple installation with an improved interface which means no matter what design information you are working with or what kind of deliverables are required, you can rely on Primavera P6 flexibility and power to get the job done on time and on budget. This application is been used by 25% of the world’s heavy industries and it can also handle group projects too.Features of Primavera P6 Professional
Oracle Primavera is one of the best, strongest, most trusted applications in project management, design and implementation.
This application is a perfect solution for managing projects and designs in any size and size with any degree of difficulty.
Primavera P6 is also used for timing as well as control of various projects.
Can organize projects of more than 100,000 activities with infinite resources and unlimited target plans.
Can allocate loads of resources and can track the progress.
Can conduct what-if analysis and can also analyze the alternative project plans.
System Requirements and Technical Details
Operating System: Windows 7/8/8.1/10
Memory (RAM): 512 MB of RAM required.
Hard Disk Space: 500 MB of free space required.
Processor: 1 GHz Intel Pentium processor or later.
-
Program size596.29 MB
-
Version17.7
-
Program languagemultilanguage
-
Last updatedBefore 3 Year
-
Downloads35058