Download Primavera P6 Professional 17.7 for Windows

Free download Primavera P6 Professional 17.7 full version standalone offline installer for Windows PC,

Primavera P6 Professional Overview

Oracle Primavera is one of the best, strongest, most trusted applications in project management, design and implementation. This application is a perfect solution for managing projects and designs in any size and size with any degree of difficulty. Primavera P6 is also used for timing as well as control of various projects. In the construction, industrial and software projects where various activities are carried out on a regular basis, this software can also be used to schedule and control the project and estimate the cost of those projects. Primavera P6 has a simple installation with an improved interface which means no matter what design information you are working with or what kind of deliverables are required, you can rely on Primavera P6 flexibility and power to get the job done on time and on budget. This application is been used by 25% of the world’s heavy industries and it can also handle group projects too.

Features of Primavera P6 Professional

Oracle Primavera is one of the best, strongest, most trusted applications in project management, design and implementation.
This application is a perfect solution for managing projects and designs in any size and size with any degree of difficulty.
Primavera P6 is also used for timing as well as control of various projects.
Can organize projects of more than 100,000 activities with infinite resources and unlimited target plans.
Can allocate loads of resources and can track the progress.
Can conduct what-if analysis and can also analyze the alternative project plans.

System Requirements and Technical Details

Operating System: Windows 7/8/8.1/10
Memory (RAM): 512 MB of RAM required.
Hard Disk Space: 500 MB of free space required.
Processor: 1 GHz Intel Pentium processor or later.

Comments

Educational & Business 17.7 icon
596.29 MB
Zip password: 123
Program details
  • Program size
    596.29 MB
  • Version
    17.7
  • Program language
    multilanguage
  • Last updated
    Before 3 Year
  • Downloads
    34974
Report a problem in downloading
Download link for : : Primavera P6 Professional
Contact our support team on our Facebook page to solve your problem directly go to the contact page